New Materials Recycling Facility at Bryn Pica
Amgen Cymru installed a new Mixed Recycling Facility (MRF) for Amgen / Rhondda Cynon Taf at a cost of £10M. Prichard’s were required to dismantle and remove the existing plant in full working order to be reassembled offsite. All services were safely disconnected or diverted. Prichard’s then carried out the groundworks for the new plant. […]
Access Road and Farm Shop Car Park
Prichard’s were appointed by Penllyn Estates Farm as Principal Contactor to construct a 850m long access road into the farm. The road consisted of removing the existing topsoil, excavations into the subsoil below, bringing up the site and levels with imported capping, subbase and a 210mm thickness of macadam. 1,650m of drainage and catchpits have […]
Regional Distribution Centre, Bridgend
Multi phase project carrying out the extension and total refurbishment of Regional Distribution Centre in Bridgend, South Wales. Prichard’s have worked with German Main Contractor WSG to carry out all of the associated groundworks over the past 12 months and still have a remaining 10 months left on the project in the final phase. Phase […]
Cot Hill Pond Construction
You will find yourself working that result partnership in an incredible Experience, and an end products that is the best.